BitHash Mining Hosting

Transparent Pricing
& Low Rates

Hosting plans from 4.0¢ to 7.8¢ per kWh. Compare turnkey site economics, lower-rate hosted slots, and quick-start plans — deposits and setup shown before you commit.

Transparent rate bands

Rates are shown as USD per kWh with cents equivalent — no hidden power markups.

Clear upfront cash needed

Each plan calls out deposit, installation, or site-build requirements before you commit.

Human review before activation

Submit the selected plan or chat with our team. Capacity and timing are confirmed first.

Hosting plans

Select a plan by cost, commitment, and speed

The cheapest rate needs a turnkey site commitment. The quickest plan avoids setup fees but carries the highest power rate.

Recommended

Pro Hosted

Balanced entry plan

Upfront
2 months rent deposit (promo: $0 advance)
Installation
$405 setup · Air $30/kW · Hydro $60/kW
Available power
Dubai facility capacity
Machine types
Air, Hydro

Avg wait time ~3 minutes · A BitHash specialist confirms capacity, terms, and deployment timing before activation.

Best for

Customers who want a simple setup cost and a competitive hosted rate.

Why choose it

  • Straightforward entry cost
  • Lower installation fee than Saver
  • Easy to compare across single-machine and fleet hosting

Consider before selecting

  • Installation fee applies before deployment
  • Monthly power rate is above Saver

Before you commit

Clear terms for UAE and international buyers

Hosting rates, deposits, installation fees, and available capacity are confirmed by a BitHash specialist before payment or activation.

01

Dubai sales contact

UAE and international inquiries are handled by the BitHash operations team before payment or activation.

02

Written kWh confirmation

The selected USD/kWh rate, deposit, setup fee, and any local-currency comparison are confirmed in your offer.

03

Capacity checked first

We validate site availability, machine compatibility, and deployment timing before locking the hosting slot.

What is included

Hosting slots include the operational backbone

The plan only changes the commercial structure. Operations still focus on uptime, monitoring, power delivery, and a secure mining environment.

Learn about hydro cooling
  • Power delivery & network
  • Rack space for ASIC slots
  • Cooling matched to site design
  • Remote monitoring & ops support
  • Physical security & access control
  • Deployment coordination

Dubai facility · Air & hydro paths · 24/7 ops

Monitored uptimeRapid rack-inFrom 4.0¢/kWh

FAQ

Frequently asked questions

Purchase machines from BitHash for instant hosting, or ship your existing hardware to Dubai. Our logistics team can collect from the arrival port or your current location and deliver to the facility for deployment.

Ready to price your hosting slots?

Pick the plan that feels closest. We validate the final rate, deposit, capacity, and deployment schedule with you before anything is locked in.