Bitmain Antminer DR7 (127TH)
BTCBitmain
Blake256R14
In Stock • Fast UAE DeploymentSKU: BIT-product-1568

Bitmain Antminer DR7 (127TH)

$2,487.96 (9,130.813 AED)

Hashrate127TH
Output Power
Power Wattage2723W
Consumption
Efficiency21.4 W/TH
Energy Rating
Guaranteed Safe & Encrypted Checkout
Pay
Pay
Product Overview & Architectural Features

Bitmain Antminer DR7 (127TH) Overview

Introducing the Antminer DR7 — Bitmain's First SCPrime Miner We’re excited to introduce the Bitmain Antminer DR7, the company’s first miner specifically designed to mine the Blake256R14 algorithm and support the SCPrime network. The Future of Mining: Blake256R14 Algorithm Blake256R14, an evolution of the original Blake algorithm, is renowned for its efficiency and robust security. Considered one of the most secure hash functions in the crypto world, Blake256R14 offers enhanced resistance to attacks while optimizing computational power. This makes it the preferred choice for many cryptocurrencies, and the DR7 is expertly engineered to handle its complex calculations, delivering exceptional performance and stability. Bitmain’s Commitment to Quality With Bitmain’s reputation for producing high-quality, reliable mining hardware, we confidently recommend the Antminer DR7 as a solid choice for miners seeking top-tier performance and security in SCPrime mining.

Live Yield & ROI Calculator

Estimated Hashrate Earnings

BTC Scenario:
Daily Net Profit

$7.37

Gross: $11.16 • Power: -$3.79

Monthly Net Profit

$224.78

Based on $0.058/kWh tariff

Annual Net Profit

$2689.94

Est. Payback: ~11 months

5-Year Cumulative Revenue Projection

TimelineEst. Gross RevenuePower CostAnnual Net ProfitCumulative Net Return
Year 1$4,073-$1,384$2,690$2,690
Year 2$3,666-$1,384$2,283$4,565
Year 3$3,299-$1,384$1,916$5,748
Year 4$2,970-$1,384$1,586$6,344
Year 5$2,673-$1,384$1,289$6,445

Full Technical Specifications

Manufacturer / BrandBitmain
Model NameBitmain Antminer DR7 (127TH)
Hashrate Output127TH
Power Consumption2723 Watts (±5%)
Mining AlgorithmBlake256R14
Energy Efficiency21.4 W/TH
Gross Weight kg
Datacenter LocationEmirates Tower, Dubai
Turnkey UAE Datacenter Infrastructure

Eliminate Mining Headaches — Explore Our Managed UAE Hosting Plans & Focus Purely on Daily Yields

Zero noise, zero heat issues, zero power outages. Fully insured 24/7 Emirates Tower facility with direct liquid hydro cooling and instant setup.

Explore Hosting Plans

Hosting Plans

Select your preferred hosting tier for Bitmain Antminer DR7 (127TH)

Saver

$0.058/kWh
$116.00 /month
  • Setup Fee: $610
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Hydro installation: $90/kW
  • Air installation: $45/kW

Pro

$0.068/kWh
$136.00 /month
  • Setup Fee: $405
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Hydro installation: $60/kW
  • Air installation: $30/kW

Elite

$0.078/kWh
$155.00 /month
  • Setup Fee: $0
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Hydro installation: Included
  • Air installation: Included

The Bitmain Antminer DR7 (127TH) from Bitmain is a high-performance ASIC miner designed for the Blake256R14 algorithm. It delivers a hashrate of 127TH with a power consumption of 2723W, offering an efficiency of 21.4 W/TH.

99.98%

Guaranteed Pool Uptime

50+ MW

Managed Power Capacity

24/7/365

On-Site Security & Engineering

Institutional Client Feedback

"BitHash turned our 2MW ASIC deployment into a seamless revenue generator in Dubai. The $0.058/kWh tariff and immediate technician response time are unmatched."

— Sheikh Tariq Al-Mansoor, Private Family Office

"Purchasing 50x Antminer S21 Pro units with managed hydro cooling gave us record yields without thermal throttling during summer heat."

— Marcus Vance, Apex Capital Mining
WordPress Reviews Category

Product Reviews & Technical Benchmarks

View All Reviews
Why Professional Bitcoin Hosting Services Improve Mining Profitability in 2026Blog

Why Professional Bitcoin Hosting Services Improve Mining Profitability in 2026

Introduction Bitcoin mining profitability is no longer determined primarily by the price of Bitcoin or the type of ASIC hardware being used. In 2026, mining has become a highly optimized infrastructure industry where performance depends on operational efficiency, uptime, energy management, cooling systems, and facility reliability. This shift has led to a major transformation in [ ]

Jun 20, 2026

Building Blockchain Infrastructure for the Future EconomyBlog

Building Blockchain Infrastructure for the Future Economy

Blockchain infrastructure and future economy discussions are becoming more visible as leaders in the digital asset sector focus on long-term systems rather than short-term speculation. Recently, a detailed feature published by The Excellence Review highlighted the journey and leadership approach of Abdulaziz Osman, CEO of BitHash. The article explored how his work is helping position [ ]

Mar 24, 2026

MicroBT WhatsMiner M30S++ Profitability in 2025: Hosting vs Home MiningReviews

MicroBT WhatsMiner M30S++ Profitability in 2025: Hosting vs Home Mining

WhatsMiner M30S++ in 2025: Compare hosting vs home mining profitability, ROI drivers, and sustainability factors.

Jan 8, 2026