
Iceriver KS5M (15TH)
$3,244 (11,905.48 AED)
Iceriver KS5M (15TH) Overview
Iceriver KS5M – 15 TH/s of Efficient, High-Performance Kaspa Mining The Iceriver KS5M is the flagship model in Iceriver’s Kaspa mining lineup, delivering a powerful 15 TH/s hashrate using the kHeavyHash algorithm with an energy consumption of just 3,400 watts. As Iceriver’s most efficient Kaspa miner to date, the KS5M offers an ideal combination of performance and energy savings. Built on Iceriver’s reliable Kaspa Miner platform, the KS5M stands out for its exceptional efficiency, durability, and stability. Designed for continuous, high-load operation, the KS5M incorporates advanced cooling technology that maintains optimal temperatures—ensuring consistent performance and extending the life of the hardware. Thanks to its robust construction and reliable performance under demanding conditions, the KS5M is a trusted choice for long-term Kaspa mining operations.
Estimated Hashrate Earnings
$-3.41
Gross: $1.32 • Power: -$4.73
$-104.15
Based on $0.058/kWh tariff
$-1246.36
Est. Payback: ~4 months
5-Year Cumulative Revenue Projection
| Timeline | Est. Gross Revenue | Power Cost | Annual Net Profit | Cumulative Net Return |
|---|---|---|---|---|
| Year 1 | $481 | -$1,727 | $-1,246 | $-1,246 |
| Year 2 | $433 | -$1,727 | $-1,294 | $-2,589 |
| Year 3 | $390 | -$1,727 | $-1,338 | $-4,013 |
| Year 4 | $351 | -$1,727 | $-1,377 | $-5,507 |
| Year 5 | $316 | -$1,727 | $-1,412 | $-7,059 |
Full Technical Specifications
Eliminate Mining Headaches — Explore Our Managed UAE Hosting Plans & Focus Purely on Daily Yields
Zero noise, zero heat issues, zero power outages. Fully insured 24/7 Emirates Tower facility with direct liquid hydro cooling and instant setup.
Hosting Plans
Select your preferred hosting tier for Iceriver KS5M (15TH)
Saver
$0.058/kWh- Setup Fee: $610
- Transport Fee: $150
- Hosting Advance: $0 (Promotion)
- 36-month contract
- Hydro installation: $90/kW
- Air installation: $45/kW
Pro
$0.068/kWh- Setup Fee: $405
- Transport Fee: $150
- Hosting Advance: $0 (Promotion)
- 36-month contract
- Hydro installation: $60/kW
- Air installation: $30/kW
Elite
$0.078/kWh- Setup Fee: $0
- Transport Fee: $150
- Hosting Advance: $0 (Promotion)
- 36-month contract
- Hydro installation: Included
- Air installation: Included
The Iceriver KS5M (15TH) from Iceriver is a high-performance ASIC miner designed for the kHeavyHash algorithm. It delivers a hashrate of 15 TH/s with a power consumption of 3400W, offering an efficiency of .
99.98%
Guaranteed Pool Uptime
50+ MW
Managed Power Capacity
24/7/365
On-Site Security & Engineering
Institutional Client Feedback
"BitHash turned our 2MW ASIC deployment into a seamless revenue generator in Dubai. The $0.058/kWh tariff and immediate technician response time are unmatched."
"Purchasing 50x Antminer S21 Pro units with managed hydro cooling gave us record yields without thermal throttling during summer heat."
Product Reviews & Technical Benchmarks
BlogWhy Professional Bitcoin Hosting Services Improve Mining Profitability in 2026
Introduction Bitcoin mining profitability is no longer determined primarily by the price of Bitcoin or the type of ASIC hardware being used. In 2026, mining has become a highly optimized infrastructure industry where performance depends on operational efficiency, uptime, energy management, cooling systems, and facility reliability. This shift has led to a major transformation in [ ]
Jun 20, 2026
BlogBuilding Blockchain Infrastructure for the Future Economy
Blockchain infrastructure and future economy discussions are becoming more visible as leaders in the digital asset sector focus on long-term systems rather than short-term speculation. Recently, a detailed feature published by The Excellence Review highlighted the journey and leadership approach of Abdulaziz Osman, CEO of BitHash. The article explored how his work is helping position [ ]
Mar 24, 2026
ReviewsMicroBT WhatsMiner M30S++ Profitability in 2025: Hosting vs Home Mining
WhatsMiner M30S++ in 2025: Compare hosting vs home mining profitability, ROI drivers, and sustainability factors.
Jan 8, 2026