LianLi Cooler - 12KW Hydro Unit
CRYPTOLianLi
Nill
In Stock • Fast UAE DeploymentSKU: LL-LIANLI-COOLER-HYD

LianLi Cooler - 12KW Hydro Unit

$1,901 (6,976.67 AED)

Hashrate360 TH/s
Output Power
Power Wattage420W
Consumption
Efficiency
Energy Rating
Guaranteed Safe & Encrypted Checkout
Pay
Pay
Product Overview & Architectural Features

LianLi Cooler - 12KW Hydro Unit Overview

LianLi Cooling Unit for Hydro-Miners – 12 kW Cooling Capacity for Efficient Home Mining The LianLi cooling unit is the perfect solution for effectively cooling hydro miners in home mining setups. Designed with convenience and performance in mind, this unit includes a built-in pump for coolant circulation, along with an inlet and outlet for liquid flow and a pressure regulation valve to control the coolant flow rate. Additionally, the necessary hoses to connect your miner are included for easy installation. What sets the LianLi cooling unit apart from other cooling solutions is its cost-effectiveness and ease of installation, providing solid cooling performance with minimal setup time and expense. This radiator is compatible with the Bitmain Antminer Hydro S19-Hydro and S21-Hydro series, as well as the WhatsMiner M33S+, M33S++, M53, and M53S. Note: Each 12 kW radiator is designed to cool a single hydro-miner only. It is not possible to use multiple miners with a single radiator.

Live Yield & ROI Calculator

Estimated Hashrate Earnings

BTC Scenario:
Daily Net Profit

$31.05

Gross: $31.64 • Power: -$0.58

Monthly Net Profit

$947.04

Based on $0.058/kWh tariff

Annual Net Profit

$11333.38

Est. Payback: ~4 months

5-Year Cumulative Revenue Projection

TimelineEst. Gross RevenuePower CostAnnual Net ProfitCumulative Net Return
Year 1$11,547-$213$11,333$11,333
Year 2$10,392-$213$10,179$20,357
Year 3$9,353-$213$9,139$27,418
Year 4$8,418-$213$8,204$32,817
Year 5$7,576-$213$7,362$36,812

Full Technical Specifications

Manufacturer / BrandLianLi
Model NameLianLi Cooler - 12KW Hydro Unit
Hashrate Output360 TH/s
Power Consumption420 Watts (±5%)
Mining AlgorithmNill
Energy Efficiency
Gross Weight kg
Datacenter LocationEmirates Tower, Dubai
Turnkey UAE Datacenter Infrastructure

Eliminate Mining Headaches — Explore Our Managed UAE Hosting Plans & Focus Purely on Daily Yields

Zero noise, zero heat issues, zero power outages. Fully insured 24/7 Emirates Tower facility with direct liquid hydro cooling and instant setup.

Explore Hosting Plans

Hosting Plans

Select your preferred hosting tier for LianLi Cooler - 12KW Hydro Unit

Saver

$0.058/kWh
$18.00 /month
  • Setup Fee: $610
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Hydro installation: $90/kW
  • Air installation: $45/kW

Pro

$0.068/kWh
$21.00 /month
  • Setup Fee: $405
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Hydro installation: $60/kW
  • Air installation: $30/kW

Elite

$0.078/kWh
$24.00 /month
  • Setup Fee: $0
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Hydro installation: Included
  • Air installation: Included

The LianLi Cooler - 12KW Hydro Unit from LianLi is a high-performance ASIC miner designed for the Nill algorithm. It delivers a hashrate of 360 TH/s with a power consumption of 420W, offering an efficiency of .

99.98%

Guaranteed Pool Uptime

50+ MW

Managed Power Capacity

24/7/365

On-Site Security & Engineering

Institutional Client Feedback

"BitHash turned our 2MW ASIC deployment into a seamless revenue generator in Dubai. The $0.058/kWh tariff and immediate technician response time are unmatched."

— Sheikh Tariq Al-Mansoor, Private Family Office

"Purchasing 50x Antminer S21 Pro units with managed hydro cooling gave us record yields without thermal throttling during summer heat."

— Marcus Vance, Apex Capital Mining
WordPress Reviews Category

Product Reviews & Technical Benchmarks

View All Reviews
Why Professional Bitcoin Hosting Services Improve Mining Profitability in 2026Blog

Why Professional Bitcoin Hosting Services Improve Mining Profitability in 2026

Introduction Bitcoin mining profitability is no longer determined primarily by the price of Bitcoin or the type of ASIC hardware being used. In 2026, mining has become a highly optimized infrastructure industry where performance depends on operational efficiency, uptime, energy management, cooling systems, and facility reliability. This shift has led to a major transformation in [ ]

Jun 20, 2026

Building Blockchain Infrastructure for the Future EconomyBlog

Building Blockchain Infrastructure for the Future Economy

Blockchain infrastructure and future economy discussions are becoming more visible as leaders in the digital asset sector focus on long-term systems rather than short-term speculation. Recently, a detailed feature published by The Excellence Review highlighted the journey and leadership approach of Abdulaziz Osman, CEO of BitHash. The article explored how his work is helping position [ ]

Mar 24, 2026

MicroBT WhatsMiner M30S++ Profitability in 2025: Hosting vs Home MiningReviews

MicroBT WhatsMiner M30S++ Profitability in 2025: Hosting vs Home Mining

WhatsMiner M30S++ in 2025: Compare hosting vs home mining profitability, ROI drivers, and sustainability factors.

Jan 8, 2026