
MicroBT Whatsminer M50S (122TH)
$1,303.11 (4,782.414 AED)
MicroBT Whatsminer M50S (122TH) Overview
ChatGPT said: The MicroBT WhatsMiner M50S (122 TH/s) is a streamlined SHA‑256 ASIC miner delivering a solid 122 TH/s hash rate at about 26 J/TH, drawing roughly 3,172 W of power for a balanced performance-to-cost ratio . Built on efficient 5 nm chip technology within a compact, air-cooled chassis (430 × 155 × 226 mm), it includes dual fans, an integrated PSU, and Ethernet connectivity—ideal for plug-and-play deployment in environments between 5–45 °C with up to 95% humidity . Typically yielding a daily net profit of around $2 (assuming $0.045/kWh electricity) , the M50S is a reliable, efficient choice for both pro mining farms and serious hobbyists. Additionally, MicroBT machines like this are known for strong after-sales support and relatively low failure rates compared to competitors.
Estimated Hashrate Earnings
$6.16
Gross: $10.72 • Power: -$4.56
$187.90
Based on $0.058/kWh tariff
$2248.60
Est. Payback: ~7 months
5-Year Cumulative Revenue Projection
| Timeline | Est. Gross Revenue | Power Cost | Annual Net Profit | Cumulative Net Return |
|---|---|---|---|---|
| Year 1 | $3,913 | -$1,664 | $2,249 | $2,249 |
| Year 2 | $3,522 | -$1,664 | $1,857 | $3,715 |
| Year 3 | $3,170 | -$1,664 | $1,505 | $4,515 |
| Year 4 | $2,853 | -$1,664 | $1,188 | $4,753 |
| Year 5 | $2,567 | -$1,664 | $903 | $4,514 |
Full Technical Specifications
Eliminate Mining Headaches — Explore Our Managed UAE Hosting Plans & Focus Purely on Daily Yields
Zero noise, zero heat issues, zero power outages. Fully insured 24/7 Emirates Tower facility with direct liquid hydro cooling and instant setup.
Hosting Plans
Select your preferred hosting tier for MicroBT Whatsminer M50S (122TH)
Saver
$0.058/kWh- Setup Fee: $610
- Transport Fee: $150
- Hosting Advance: $0 (Promotion)
- 36-month contract
- Hydro installation: $90/kW
- Air installation: $45/kW
Pro
$0.068/kWh- Setup Fee: $405
- Transport Fee: $150
- Hosting Advance: $0 (Promotion)
- 36-month contract
- Hydro installation: $60/kW
- Air installation: $30/kW
Elite
$0.078/kWh- Setup Fee: $0
- Transport Fee: $150
- Hosting Advance: $0 (Promotion)
- 36-month contract
- Hydro installation: Included
- Air installation: Included
The MicroBT Whatsminer M50S (122TH) from MicroBT is a high-performance ASIC miner designed for the SHA-256 algorithm. It delivers a hashrate of 122TH with a power consumption of 3276W, offering an efficiency of 26.9 W/TH.
99.98%
Guaranteed Pool Uptime
50+ MW
Managed Power Capacity
24/7/365
On-Site Security & Engineering
Institutional Client Feedback
"BitHash turned our 2MW ASIC deployment into a seamless revenue generator in Dubai. The $0.058/kWh tariff and immediate technician response time are unmatched."
"Purchasing 50x Antminer S21 Pro units with managed hydro cooling gave us record yields without thermal throttling during summer heat."
Product Reviews & Technical Benchmarks
BlogWhy Professional Bitcoin Hosting Services Improve Mining Profitability in 2026
Introduction Bitcoin mining profitability is no longer determined primarily by the price of Bitcoin or the type of ASIC hardware being used. In 2026, mining has become a highly optimized infrastructure industry where performance depends on operational efficiency, uptime, energy management, cooling systems, and facility reliability. This shift has led to a major transformation in [ ]
Jun 20, 2026
BlogBuilding Blockchain Infrastructure for the Future Economy
Blockchain infrastructure and future economy discussions are becoming more visible as leaders in the digital asset sector focus on long-term systems rather than short-term speculation. Recently, a detailed feature published by The Excellence Review highlighted the journey and leadership approach of Abdulaziz Osman, CEO of BitHash. The article explored how his work is helping position [ ]
Mar 24, 2026
ReviewsMicroBT WhatsMiner M30S++ Profitability in 2025: Hosting vs Home Mining
WhatsMiner M30S++ in 2025: Compare hosting vs home mining profitability, ROI drivers, and sustainability factors.
Jan 8, 2026